AHU Removal and Replacement - ITP Aero, Hucknall

Industrial

This project was a great example of improving energy efficiency in a factory setting, In order to achieve this we installed two reverse scroll air source heat pumps driving new air handling units, for this large manufacturing building.

This Project included all of the following:
-M&E design
-Energy consumption reporting
-Removal of existing gas fired AHU’s
-Lift, shift and disposal
-Preparation and cleaning
-Power and lighting install
-Plant support build work
-Plant, pipework and controls install
-Thermal insulation and trace heating
-Ductwork and fibre sock alterations and install
-Plant acoustics
-Plant room flooring
-Plant room decoration
-Plant commission and balance of distribution

New Buffer & Stainless Steel Pipework @ ITP Hucknall
Air Source Heat Pump @ ITP Hucknall
630A Isolators Feeding AHU @ ITP Hucknall
Fix Speed Twin Head Pump @ ITP Hucknall
Steel Pipework & Pump @ITP Hucknall
Air Handling & Control Panel @ ITP Hucknall
Insulated Stainless Distribution & Buffer Vessels @ ITP Hucknall
Modulating Twin Head Pump Set @ ITP Hucknall
Coil Connections For AHU @ ITP Hucknall
Bottle Storage For Hydrogen Distribution @ ITP Hucknall
New Free Air Louvre @ ITP Hucknall