This project was a great example of improving energy efficiency in a factory setting, In order to achieve this we installed two reverse scroll air source heat pumps driving new air handling units, for this large manufacturing building.
This Project included all of the following:
-M&E design
-Energy consumption reporting
-Removal of existing gas fired AHU’s
-Lift, shift and disposal
-Preparation and cleaning
-Power and lighting install
-Plant support build work
-Plant, pipework and controls install
-Thermal insulation and trace heating
-Ductwork and fibre sock alterations and install
-Plant acoustics
-Plant room flooring
-Plant room decoration
-Plant commission and balance of distribution